Skip to content

sync with other branch #8

sync with other branch

sync with other branch #8

Triggered via push November 13, 2024 13:57
Status Cancelled
Total duration 1m 31s
Artifacts

ci.yml

on: push
Matrix: ci
Fit to window
Zoom out
Zoom in

Annotations

6 errors and 1 warning
docker-build
The run was canceled by @rahulait.
docker-build
The operation was canceled.
ci (1.22)
The run was canceled by @rahulait.
ci (1.22)
The operation was canceled.
ci (stable)
The run was canceled by @rahulait.
ci (stable)
The operation was canceled.
docker-build
main is not a valid semver. More info: https://semver.org/